Site team in hard hats and hi-vis discussing testing on a construction site
Construction & Handover

Air tightness testing

Under Part L 2021 every new dwelling must be air tested before completion, and the result feeds straight into the as-built SAP. A poor result can push a home out of compliance even when everything else is right.

We test homes and commercial buildings across Manchester and the North West, help you prepare the building beforehand, and if a test fails we find the leaks with smoke diagnostics so you can fix and retest the same day where possible.

When you'll need it

  • Every new dwelling before completion
  • Commercial buildings over the size threshold
  • Change of use projects creating new homes
  • Mid-build tests to catch problems early

What's included

  • Pre-test checklist so the building is ready
  • Calibrated blower door test to current standards
  • Air permeability certificate for Building Control
  • Results passed straight into your as-built SAP
  • Smoke diagnostics to locate leaks if needed
  • Same-day retest where practical

Air tightness testing FAQs

Does every new home need an air test?

Yes. Part L 2021 requires every new dwelling to be tested, rather than a sample on larger sites as before.

How should I prepare for an air test?

Close windows and external doors, fill traps with water, seal any temporary openings and finish the airtightness details. We send a checklist before every booking.

What happens if the test fails?

We use smoke diagnostics to show where air is getting in, so you can seal it and retest, often on the same visit.

Get a fixed quote

Need air tightness testing?

Send your drawings, planning reference or Building Control comments and we'll reply with a fixed quote, usually the same day.